After thorough inspection and investigation of the existing roof system, the experienced professionals at Landmark Construction devised the perfect solution for Kings Command Foods flat roofing woes. The skilled specialists at Landmark recommended installing a Duro-Last custom-prefabricated commercial roofing system. This roofing system is ideal for any flat or low-sloped applications. It is extremely durable, watertight, resistant to chemicals, fire, high wind, and is virtually maintenance free. As an authorized and award winning Duro-Last Roofing Contractor, Landmark Construction knew that it was important to install a roofing system from a company that stands behind their contractors and their products. As such, Duro-Last offers the best commercial warranties in the industry and is the only company that warrants the contents of the building against leaks from installation and material errors.

This fully Code Compliant Duro-Last Roofing system included a Duro-Guard vapor retarder to control water condensation, New Duro-Guard Rigid Insulation to comply with the updated Washington Energy code, and new Duro-Guard gypsum coverboard to help with the heavy foot traffic associated with roof equipment maintenance. It also included custom prefabricated accessories precisely measured and installed for the many roof penetrations, curbs, drains, and projections for a worry-free, quality installation in these otherwise common problem areas. And finally, the roofing system included code compliant metal edge and drainage details by Exceptional Metals, a Duro-Last family company.

An 8-week roofing project that was scheduled while the business was fully operational was a significant challenge for the technicians at Landmark Construction. They needed to remove and dispose of the old failed rubber roof covering and install the new Duro-Last Roofing system without disrupting business operations. By partnering with Duro-Last, the prefabricated roofing system allowed the Landmark Team to take control of a challenging construction operation in a highly unstable environment and weather conditions. Landmark planned this roofing project carefully and the project benefitted from greater productivity, a higher quality installation, no disruptions to business, and one very satisfied customer. The project was completed 2-weeks ahead of schedule, in just 6 weeks.

Thanks to Landmark Construction and Duro-Last Roofing, Kings Command Foods flat roofing aggravations have finally been solved. Worker safety and production have significantly improved, annual maintenance costs have almost disappeared, and overall building performance is more effective and efficient than ever.